Terms & Conditions
Email this page as link Email the PDF page as link Click here to download Terms and Conditions in pdf format
1. This price list is effective from 01-06-2010 and supersedes all the earlier ones.
2. The foundation details provided are for typical soil conditions, wind loading etc.,
3. Foundation hardwares can be supplied with poles at extra cost indicated in page no. F1, F2, F3.
4. Foundation templates can be supplied at extra cost.
5. Colour choice other than standard finish (as indicated against the items) will be charged 10% extra and for metallic finish 15% extra.
6. Efforts are always on to improve the design and methods to manufacture. Hence actual dimensions are subject to changes without prior notice.
7. The List Prices are ex-factory Chennai and are subject to alteration without prior notice.
8. List price does not include cost of lamps, internal cabling from control gear box to top of the pole, taxes, octroi and other levies.
9. But for Cobra, Tusker, Kalinga, Harpanch, Galaxy, Exendra Series and Solga wall brackets, list prices are exclusive of luminaire cost. (Luminaire out sourced).
10. CST / VAT will be charged extra as applicable.
11. Order shall accompany with an advance of 30% of the value and balance against proforma invoice prior to despatch.
12. Disputes if any are subject to Chennai jurisdiction only.